Skip to main content
Silveira Drypack
Freshly screeded shower floor mortar bed sloped toward a stainless linear drain

Specialized substrate & shower preparation

Drypack and shower preparation, built to the millimetre.

Silveira Drypack prepares what the finish depends on: scratch coat, waterproofing membrane, drypack mortar beds and sloped shower bases — packed, screeded and checked so the tile that follows sits flat, drains properly and lasts.

Working with contractors, builders, renovators and tile professionals in Toronto, Ontario.

What we do

Four services. One discipline.

Every layer we build is a substrate for someone else's finish, which is why each one is set out, checked and detailed on its own terms.

The Silveira approach

Preparation decides the finish.

A tiled shower is an assembly, not a surface. Each layer — the substrate, the keyed base coat, the waterproofing plane, the mortar bed — has a job, and each one depends on the accuracy of the layer beneath it.

Once tile goes down, the substrate is no longer accessible. A bed that is out of plane, a fall that flattens near the drain, or a membrane detail rushed at a corner cannot be corrected afterwards without opening the work back up.

That is why our scope stops where the finishing trade begins. We concentrate on the layers that get covered, and hand over work that is measured, checked and ready to build on.

More about how we work
Spirit level and steel straightedge checking the plane of a sharp mortar corner

Process

Assess. Prepare. Build. Finish.

  1. 01

    Assess

    Review the drain, substrate, framing, heights and access, and confirm what the assembly needs before any material is mixed.

  2. 02

    Prepare

    Set the reference points and protect the area — lath, screed rails, drain height and perimeter lines established before packing begins.

  3. 03

    Build

    Pack, screed and compact the mortar to the required plane or slope, then detail corners, curbs and edges by hand.

  4. 04

    Finish

    Check the plane and fall, clean the area, and hand over a substrate the tile setter or finishing trade can build straight onto.

Craftsmanship

The details that disappear under the tile.

Corners, curbs, drain surrounds and changes of plane are where a substrate is made or lost. They are shaped by hand and checked before anything covers them.

Shower base with drypack mortar falling evenly toward a centre drain
Consistent fall to the drain
Horizontal grooves combed into a cement scratch coat over metal lath
Keyed base coats
Waterproofing membrane detailed into a shower corner and niche
Detailed membrane transitions

Questions

Drypack, explained.

Common questions from homeowners and trades about the work we do.

See all questions

Contact

Talk to Silveira Drypack

Phone
+1 (647) 703-5767
Email
lucassilveiratoronto@hotmail.com
Instagram
@silveira_drypack

Request a Quote

Planning a shower or substrate build?

Send the project details and we will come back to you about scope, sequencing and scheduling.